Education Terraces

Name: Project for the construction of the lecture hall building at the Faculty of Education – Tanta University

Owner: Tanta University

Main Contractor: Military Production Company for Projects, Engineering Consultations, and General Supplies

Project Overview:
Project Duration: 24 months
Building Area: 1100 m²
Consists of:
1- Ground floor
2- First and second repeated upper floors
3- Third and fourth repeated floors
4- Service floor (roof)

Student Services Annex Building

Name : Student Services Annex Building at the Faculty of Engineering – Tanta University

Owner: Tanta University

General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies

About the project:
Project Duration: 24 months
Total building area: 685 m2
It consists of:
1- Ground floor
2- Repeated first, second and third upper floor
3- Upper fourth floor
4- The role of services (surface)

Samanoud

Name : Development of the Holy Family Trail Samanoud City Center

Owner: Gharbia Governorate

General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies

About the project:
Project Duration: 3 Months

Raising a civil and preparatory building

Name : Construction of a preparatory and civil building at the Faculty of Engineering – Tanta University

Owner: Tanta University

General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies

About the project:
Project Duration: 24 months
Raising three lofts
Total building area: 4000 m2

Air Control Tower

Name : Securing the operation of the old tower (2) as an alternative to the air traffic control tower No. (3)

Owner: National Air Navigation Services Company

General Contractor: Arab Organization for Industrialization (Arab Company for Real Estate and Tourism Projects)

About the project:
Project Duration: 12 Months

Icao

Name : Raising the efficiency, development and maintenance of the ICAO Regional Headquarters Building

Owner: Cairo Airport Company

About the project:
Project Duration: Two months