Establishment of Bareit Lasifer Institute (P/S) for Boys – Kafr El Sheikh

Project: Establishment of Bareit Lasifar Institute for Boys (P/S) - Kafr El-Sheikh

Owner: Al-Azhar Al-Sharif

General Contractor: Military Production Company for Projects, Engineering Consultations and General Supplies

Project Overview:

Project Duration: 18 months

Project Gallery

  • Gallery Image 1
  • Gallery Image 2
  • Gallery Image 3
  • Gallery Image 4
  • Gallery Image 5
  • Gallery Image 6
  • Gallery Image 7
  • Gallery Image 8
  • Gallery Image 9
  • Gallery Image 10
  • Gallery Image 11
  • Gallery Image 12
  • Gallery Image 13
Establishment of Bareit Lasifer Institute (P/S) for Boys – Kafr El Sheikh | Yathreb