Project: South Valley Development – Toshka
Owner: Ministry of Water Resources and Irrigation
General Contractor: Armed Forces Engineering Authority (Military Engineers Department)
Project Duration: 6 months
Consists of:
1- Bridge Structure No. 6+300
2- Barbakh Structure No. 22+914
3- Intake Structure No. 18+000
4- Intake Structure No. 19+900
















![{"remix_data":[],"remix_entry_point":"challenges","source_tags":["local"],"origin":"unknown","total_draw_time":0,"total_draw_actions":0,"layers_used":0,"brushes_used":0,"photos_added":0,"total_editor_actions":{},"tools_used":{"remove":1},"is_sticker":false,"edited_since_last_sticker_save":true,"containsFTESticker":false}](https://yathrep.com/wp-content/uploads/2024/09/Picsart_24-02-13_23-03-18-043.jpg)