Projects Delivered

Establishment of Bareit Lasifer Institute (P/S) for Boys – Kafr El Sheikh
Project: Establishment of Bareit Lasifar Institute for Boys (P/S) – Kafr El-Sheikh Owner: Al-Azhar Al-Sharif General Contractor: Military Production Company for Projects, Engineering Consultations and

South Valley Development – Toshka
Project: South Valley Development – Toshka Owner: Ministry of Water Resources and Irrigation General Contractor: Armed Forces Engineering Authority (Military Engineers Department) Project Duration: 6

Waste Recycling Plant Wall – El Mahalla El Kubra
Project: Construction of a fence for a waste recycling plant – El-Mahalla El-Kubra Owner: Gharbia Governorate Project Overview: Project Duration: 6 months

Indoor Hall Development Works – Tanta Sports Stadium
Project: Covered Hall Development Works – Tanta Sports Stadium Owner: Ministry of Youth and Sports General Contractor: Military Production Company for Projects, Engineering Consultations and

Construction of a 900 m long Al-Haikstab fence
Project: Construction of a 900m long high-step fence Owner: Armed Forces Engineering Authority Project Overview: Project Duration: 6 months

Redeployment of the 5th Division – Heikstep
Project: Repositioning the Fifth Air Defense Division – Al-Haikstep Owner: Armed Forces Engineering Authority Project Overview:– 2 concrete hangars 18 * 50 m– Metal hangar

Development and paving of the new railway
Project: Development and paving of the new railway – Sayed El-Badawy Owner: Gharbia Governorate General Contractor: Military Production Company for Projects, Engineering Consultations and General

Construction of service buildings – Alexandria Sporting Club (Sporting)
Project: Construction of service buildings – Alexandria Sporting Club (Sporting) Owner: Alexandria Sporting Club (Sporting) General Contractor: Military Production Company for Projects, Engineering Consultations and

Additional submarine cable building – Abu Talat
Project: Construction of the additional submarine cable building – Abu Talat Owner: Telecom Egypt Project duration: 5 months

Air College – Belbeis
Project : Construction of the accommodation, educational and Food Court building – Air College Owner: Armed Forces Engineering Authority Project duration: 6 months

Social Housing 41 Buildings – October Gardens
Project : Construction of 41 Social Housing Buildings – October Gardens Owner: New Urban Communities Authority Project Duration: 12 months

New Mansoura
Project: Construction of 11 residential buildings – New Mansoura City Owner: New Urban Communities Authority Project Duration: 12 Months Building Area: 420 m2 Consists of:
Medical Complex
Name : Development of facilities at the medical complex – Tanta University
Owner: Tanta University
General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies
About the project:
Project Duration: 6 Months
Project Area: 40.000 m2

Completion of Education
Name : Completion of the auditorium building at the Faculty of Education – Tanta University
Owner: Tanta University
General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies
About the project:
Project Duration: 6 Months
Building Area: 605 M2
It consists of:
-Basement
– Ground
– 4 Lofts
-Services

Education Terraces
Name: Project for the construction of the lecture hall building at the Faculty of Education – Tanta University
Owner: Tanta University
Main Contractor: Military Production Company for Projects, Engineering Consultations, and General Supplies
Project Overview:
Project Duration: 24 months
Building Area: 1100 m²
Consists of:
1- Ground floor
2- First and second repeated upper floors
3- Third and fourth repeated floors
4- Service floor (roof)

Painting the facades of Terminal 3 at Cairo Airport
Name : Exterior façade painting works in Terminal 3 – Cairo Airport
Owner: Cairo Airport Company
About the project:
Project Duration: Two months

Student Services Annex Building
Name : Student Services Annex Building at the Faculty of Engineering – Tanta University
Owner: Tanta University
General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies
About the project:
Project Duration: 24 months
Total building area: 685 m2
It consists of:
1- Ground floor
2- Repeated first, second and third upper floor
3- Upper fourth floor
4- The role of services (surface)

Samanoud
Name : Development of the Holy Family Trail Samanoud City Center
Owner: Gharbia Governorate
General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies
About the project:
Project Duration: 3 Months

Raising a civil and preparatory building
Name : Construction of a preparatory and civil building at the Faculty of Engineering – Tanta University
Owner: Tanta University
General Contractor: Military Production Company for Projects, Engineering Consultancy and General Supplies
About the project:
Project Duration: 24 months
Raising three lofts
Total building area: 4000 m2